
SPECIFICATIONS HIGHLIGHTS FLOOR PLAN LOCATION
Specification
GENERAL
- Framed R.C.C. Earth quake proof structure with laterite walls for exteriors and concrete blocks for internal walls.
- External plastering with superior quality water proofing compounds.
- Internal walls and ceilings are finished with 2 coats of acrylic based putty and finished with 2 coats of distemper.
- Bed room doors are of wooden frames with superior quality flush door, painted with 2 coats of putty and enamel paint.
- Main entrance door are made out of teak wood with melamine polish.
- For toilets R.C.C. door frames with good quality fibrotech shutters
- Windows with heavy duty Aluminum sliding shutters and safety grills.
- Source of water is from bore well / open well in addition to the Corporation water connection.
- External painting of the building with exterior grade approved paints.
- In the hall provision for Telephone / T.V.Point / Intercom connection and adequate light points.
- In master bed room TV point/telephone point/AC provision and adequate light points.
BATHROOMS:
- Coloured ceramic tiles (non slippery) for toilet floors and glazed tile dado up to full height
- Quality CP fittings in all toilets.
- Wall mounted E.W.C for all toilets with flush control.
- Provision for exhaust fan and light point above wash basin.
- PVC/UPVC/CPVC pipes are used in the toilets.
- Hot & cold shower mixer for all toilets
KITCHEN / UTILITY:
- Provision for fixing water purifier.
- Kitchen top with bull nosed black granite.
- Stainless steel sinks with drain board.
- Gas connection with meter.
- Provision for exhaust fan and adequate lighting facility.
- Plumbing & Drainage connection for washing machine, refrigerator, oven and hob.
- 2'0” glazed tile dado above platform.
